- Home
- Government
- Departments A - M
- Engineering/County Engineer
- Reports and Studies
Reports and Studies
17th Street
- 17th Street Bridge Public Information (PDF)
- 17th Street Culvert Alternatives (PDF)
- 17th Street Culvert Photos of Finishes (PDF)
- 17th Street NJDOT 4-Bar Parapet (PDF)
- 17th Street Sandblast Finishes (PDF)
- 17th St. Public Information Meeting Info.
- 17th Street Culvert Coast Guard Public Notice (PDF)
- 17th Street Culvert NJ Department of Public Works Office of the County Engineer Permit Plans (PDF)
Bike Studies
Commonwealth Ave./Landis Ave. Traffic Study
CR621 Corridor Traffic Signal Optimization
Dennisville-Petersburg Road
Evacuation Plans
Hazard Mitigation
JFK Boulevard
Misc.
NJ Route 55/47/347
- Shore Connection Committee Handbook, Parsons Brinkerhoff 1997-1998
- Summary of Progress on the Shore Connection Intersection Study
- Route 347 Reverse Lane Strategy
- Army Corps Technical Data 1992 Hurricane Evacuation Study
- Route 55 Freeway Extension Feasibility Study Gannet Fleming, Inc. 1993
- Shore Connection Committee Report, Parsons Brinkerhoff 1997-1998
- Shore Connection Concept Development Report, NJ Route 47 Corridor September 2003
- Technical Memorandum 1 Freeway Alignments
- Technical Memorandum 2 Land Service Improvements and Bypasses
- Technical Memorandum 3 Environmental Constraints
- Technical Memorandum 4 Needs Assessment and Traffic Data
Ocean Drive over Middle Thorofare Bridge Replacement Project
- Ocean Drive Stormwater Infrastructure Conveyance System Upgrades (PDF)
- Assessing Bat and Bird Migration-Middle Thorofare (PDF)
- Ocean Drive (CR 619) Upgrades and Bridge Replacements (PDF)
- Part 2 Technical Addendum for Alternative Analysis Report
- Alternative Analysis Report Part 1
- November 1, 2017 Public Officials Presentation
Ocean Drive (CR619) Resurfacing Improvements 29th to 62nd Street, Avalon
Parkway Projects
Rio Grande Entrance Improvements
- Concept Development Study
- Rio Grande Ave Stakeholders Meeting Invitation and Survey
- Rio Grande Ave Preferred Alternative
- Rio Grande Ave Signs, Pavers and Lights
- Flooding Analysis Preliminary Design October 2017
- Rio Grande Avenue Preliminary Design October 2017
- Public Information Center October 2, 2017
- Entrance Signage
- Preliminary Traffic Control Plan
- Profile and Intersection Details
- Rio PIC Presentation 10-2-17
- Typical Section Details
- Rio Grande Avenue Project CommentForm-Oct2017
- Rio Grande Avenue Project Information-Oct2017
Roosevelt Boulevard
Sea Isle Boulevard
- Sea Isle Boulevard Section II permits (PDF)
- Sea Isle Boulevard Section II Traffic Control Plans I
- Sea Isle Boulevard Section II Traffic Control Plans II
- Sea Isle Boulevard Section II Construction Details (PDF)
- Sea Isle Boulevard Section II Constrution Plans 2 (PDF)
- Sea Isle Boulevard Section II Constrution Plans I (PDF)