On Monday and Tuesday April 25th and 26th, DeHirsch Avenue (C.R. 550) in Woodbine will be closed to thru traffic and a detour will be in place between Washington Avenue and Heilprin Avenue as DeHirsch Avenue is resurfaced. The detour will occur during the hours of construction and the roadway will be reopened to traffic at the end each day.
Motorists heading west on DeHirsch Avenue (C.R. 550) will be detoured south onto Heilprin Avenue then west onto South Dehirsch Avenue. Motorists will continue west on South DeHirsch Avenue to Washington Avenue (C.R. 557).
Motorist approaching DeHirsch Avenue (C.R. 550) from Washington Avenue wishing to head east on DeHirsch Avenue will be directed to South DeHirsch Avenue. Motorists will continue heading east on South DeHirsch Avenue to Heilprin Avenue. They will then turn onto Heilprin Avenue and head north back to DeHirsch Avenue (C.R. 550).
Business access will be maintained at all times and residents will have access to their homes. Local traffic will be maintained. At Heilprin Avenue and at Washington Avenue, a hard closure will be installed, and thru traffic will not be permitted into the work zone. Motorists are to proceed with caution and are to obey the 25 MPH posted speed along South DeHirsch Avenue which will be strictly enforced.